Construction update: week of 8/31

| | Comments (0) | TrackBacks (0)
I-96 logo small.jpgI-96: Resurfacing continues WESTBOUND between CASCADE RD and M-21/FULTON ST, but only overnights. Watch for lane closures now through Wednesday (9/2) between 8 p.m. and 5 a.m. Resurfacing continues EASTBOUND overnights between CASCADE RD and LEONARD ST.




I-196: Overnight lane closures both EASTBOUND and WESTBOUND between the 32ND AVE/HUDSONVILLE exit and the 64TH AVE bridge 7 p.m. to 7 a.m. through Thursday morning (9/3).





Business_Loop_196 100x80.jpgI-196 BUSINESS LOOP: More repaving again on the highway between Zeeland and Holland, but lane closures will be in place only at night. Watch for them between the MACATAWA RIVER BRIDGE and US-31 through Wednesday (9/2) 7 p.m. to 7 a.m.





I-94 logo 75x75.jpgI-94: Pavement repairs will cause the closure of the right lane on EASTBOUND I-94 weekdays between Mile Marker 47 and Mile Marker 56 from now through September 18 round the clock except afternoon rush, 4:30 p.m. and 7:30 p.m.



0 TrackBacks

Listed below are links to blogs that reference this entry: Construction update: week of 8/31.

TrackBack URL for this entry: http://ui-blogs.trb.com/cgi-bin/mt4/mt-t.cgi/68555

Leave a comment

About this Entry

This page contains a single entry by Robb Westaby, Fox 17 Traffic published on August 31, 2009 8:38 AM.

Friday and weekend construction changes was the previous entry in this blog.

States that ban texting while driving is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.