When will it be done?

| | Comments (0) | TrackBacks (0)
Highway signs.JPGYeah, I keep asking myself the same thing.


US-131 @ 44TH ST:

  • The ramp from NORTHBOUND US-131 to 44TH ST is scheduled to open on November 28.
  • The ramp from 44TH ST to SOUTHBOUND US-131 is scheduled to open November 28.
  • The lane closure on SOUTHBOUND US-131 at 36TH ST is scheduled to be removed November 21.
  • The lane closure on NORTHBOUND US-131 at 54TH ST is scheduled to be removed on November 25.

I-196 between KENOWA AVE and 28TH ST:

  • All ramp closures and lane closures are scheduled to be removed by Saturday, November 14.

M-21 over the Flat River in Lowell:

  • Various traffic shifts and lane closures are scheduled to end by November 18.

M-37 at M-46:

  • The construction of the roundabout is complete, but there is still a narrow squeeze for further work until November 20.

US-31 at FILLMORE ST:

  • The lane closure on NORTHBOUND US-31 at FILLMORE ST is scheduled to end November 13.
  • The lane closure on SOUTHBOUND US-31 at FILLMORE ST is scheduled to end November 14.

0 TrackBacks

Listed below are links to blogs that reference this entry: When will it be done?.

TrackBack URL for this entry: http://ui-blogs.trb.com/cgi-bin/mt4/mt-t.cgi/69800

Leave a comment

About this Entry

This page contains a single entry by Robb Westaby, Fox 17 Traffic published on November 11, 2009 10:27 AM.

Watch This: Woman falls in front of train was the previous entry in this blog.

Is the driver in the next lane awake? is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.